How long does a kitchen fit-out take?
A straightforward like-for-like kitchen refit is typically 2–3 weeks. Reconfigured layouts, knock-throughs or extensions that include the new kitchen run longer, and we'll give you a realistic programme at the estimate stage.
How long does a bathroom fit-out take?
A standard family bathroom refit is usually 7–10 working days from strip-out to silicone. En-suites are often quicker; wet rooms with tanking and screeded floors take longer.
Do you supply the units and suite, or do I?
Either. Some clients buy their kitchen or bathroom directly and we fit; others ask us to source from a trusted local supplier. We'll price both ways and be honest about the trade-offs.
Do you do the gas and electrical work yourselves?
No. Gas and electrical connections are handled by trusted Gas Safe and NICEIC-registered subcontractors we've worked with for years. We schedule and coordinate them so the room finishes on one programme.
Can you move a wall or knock through as part of the fit?
Yes. Structural alterations, RSJs and knock-throughs are part of our general building work: often the whole point of a kitchen or bathroom refit is opening the room up. We handle the structural side and the fit-out on one estimate.
Do you tile as part of the fit, or do I need a separate tiler?
We tile as part of the fit. Wall and floor tiling, tanking to wet areas, natural stone and large-format porcelain all part of the standard scope.
Are you insured?
Yes: £5,000,000 public liability and £10,000,000 employers' liability. Documents on request before we start.
Do you cover the Cotswold villages and Swindon suburbs?
Yes: Highworth, Swindon, Lechlade, Fairford, Cirencester, Faringdon, Witney, Burford and Shrivenham are all part of our normal patch.